Free impact-effort matrix maker
An impact-effort matrix sorts ideas by how much they matter and how hard they are to do. Add your ideas below, drag each one into a quadrant, and download the result as a PNG. No sign-up. Your ideas stay in your browser.
Your ideas
Tip: drag ideas onto the board, or tap an idea and then tap the board. With a keyboard, Tab to an idea, press Enter, move it with the arrow keys and press Enter to drop it.
Want your team to add ideas from their phones?
Continue in PrioritasWhat is an impact-effort matrix?
An impact-effort matrix, also called an action priority matrix or value vs effort matrix, is a 2×2 grid. The vertical axis is impact, the horizontal axis is effort. Each idea lands in one of four quadrants, which tells you what to do with it.
Sources for the other names: ProductPlan, "Action Priority Matrix" (action priority matrix); Atlassian, "Prioritization frameworks" (value vs effort).
- Quick wins
High impact, low effort. Do these first.
- Strategic
High impact, high effort. Plan them as bigger projects.
- Reconsider
Low impact, low effort. Fill-ins when there is spare time.
- Avoid
Low impact, high effort. Usually not worth doing.
Some guides name the quadrants quick wins, major projects, fill-ins and thankless tasks; they mean the same four boxes. Source: ProductPlan, "Action Priority Matrix".
How to score impact and effort
Score each idea on two questions: how much would it move your goal, and what would it cost to do? Rough answers are enough, as long as you answer them the same way for every idea.
- Write the goal down first. Impact only means something against one goal. If ideas serve different goals, give each goal its own matrix.
- Count every kind of effort. Effort is time, money and people, plus the risk and coordination an idea needs, not only hours of work.
- Compare, don't calculate. You don't need a score out of ten. Place each idea relative to its neighbours: is it more or less valuable, more or less work?
- Place first, discuss second. You can have each person place ideas on their own before the group talks, so the first opinion voiced doesn't anchor everyone else.
- Split ideas that sit on a line. An idea on a divider is often two ideas: a small first step and a bigger follow-up. Split it and place each part.
How to run an impact-effort session
You can run a session on your own with the free maker above, or with a group. These steps work either way.
- Agree the goal and write it where everyone can see it.
- Collect every idea without judging it. Quantity first.
- For each idea, ask: how much would this move the goal? That is impact.
- Then ask: how much time, money or people would it take? That is effort.
- Place it, compare it with its neighbours, and adjust.
- Decide: start with the quick wins, turn the strategic ideas into a plan, keep the reconsider ideas for spare time, and drop or rethink the avoid ideas.
- Revisit the matrix when you learn something new; an idea can move.
Running it with a group in Prioritas
In Prioritas, your team joins by scanning a QR code and places ideas together, live. A session takes up to 50 participants. Facilitators can pause and resume a session, or end it. Agree impact and effort together, then turn the quick wins and strategic bets into a roadmap you can export.
Weighing this tool against a spreadsheet or whiteboard template? Compare free impact-effort matrix templates.
Worked examples
Two example matrices, six ideas each. Download either as a CSV to start your own.
A product team's Q3 ideas
Goal: more teams running their first session in the first week.
| Idea | Impact | Effort | Quadrant |
|---|---|---|---|
| Join by QR code | High | Low | Quick wins |
| Auto-tag themes | High | Low | Quick wins |
| Slack digest | High | High | Strategic |
| Offline mode | High | High | Strategic |
| Dark theme | Low | Low | Reconsider |
| Custom fonts | Low | High | Avoid |
A volunteer group's ideas for a community event
Goal: more people signing up to attend.
| Idea | Impact | Effort | Quadrant |
|---|---|---|---|
| Online sign-up form | High | Low | Quick wins |
| Reminder emails | High | Low | Quick wins |
| Partner with local businesses | High | High | Strategic |
| Live music stage | High | High | Strategic |
| Printed posters | Low | Low | Reconsider |
| Custom event app | Low | High | Avoid |
Download this example as a CSV: A volunteer group's ideas for a community event
Common mistakes
- Judging ideas while collecting them. Criticism during the brainstorm cuts the list short. Collect first, then place.
- Mixing goals on one matrix. An idea can be high impact for one goal and low for another. One matrix, one goal.
- Treating effort as hours only. A cheap idea that needs three teams to agree is not low effort.
- Letting one voice place everything. Place ideas individually, then discuss the ones where people disagree.
- Dropping the reconsider quadrant on day one. Low impact, low effort ideas are cheap fill-ins when there is spare capacity.
Questions
Is this free?
Yes. The matrix maker is free with no sign-up, and your ideas stay in your browser.
What is the difference between impact-effort and the Eisenhower matrix?
Eisenhower sorts tasks by urgency and importance; impact-effort sorts ideas by value and cost. Use Eisenhower for your to-do list and impact-effort for deciding what to build. Source: Dwight D. Eisenhower, address at Evanston, Illinois, 19 August 1954 (The American Presidency Project).
How many ideas should go on one matrix?
As many as you can discuss in the time you have. If the board gets crowded, check whether the ideas serve more than one goal and split them into one matrix per goal.
Can I keep the example data?
Yes. Each worked example has a CSV download you can open in any spreadsheet.
How do I run this with my team?
Continue in Prioritas: your team joins by scanning a QR code and places ideas together, live.
Last updated: · By The Prioritas team